Painting
Exterior :
Elastomeric Paint (10years of Waterproofing Warranty + 10 years of Paint Performance + 10 years of Algae fungus):
Applying one coat of base coat undiluted and two coats of Elastomeric based top coat of approved colour to surface duly cleaned & prepared as per the manufacturer required.Exterior :
Elastomeric Paint (10years of Waterproofing Warranty + 10 years of Paint Performance + 10 years of Algae fungus):
Enamel :
Applying two coats of Enamel Paint after treating the surface with zinc/ Primer, Putty etc after scraping the loose old paint and scales of metal.
Acrylic Paint :
Applying one coat of First Quality Exterior Primer and two coats of Acrylic Paint of approved colour to surface duly cleaned & prepared.
OBD / Semi Acrylic Paint :
Applying one coat of Acrylic Primer and two coat of Acrylic Distemper Paint after treating the surface with putty etc.
Plastic Paint:
Applying one coat of Acrylic Primer & two coats of Emulsion Plastic paint.
Oil Paint:
Applying two coats of Oil Paint after treating the surface with Red Oxide Primer, Putty, etc and scraping the loose old paint and scales of metal.
White Wash Paint :
Applying two coat of white wash over thoroughly cleaned and flake free surface.
Synthetic Texture :
Applying one coat of External Primer and 1 coat of Texture over cleaned surface up to 2mm thick.
Crack filling :
Opening the cracks and filling it with crack filler.
Hand Rail Polish :
Hand Rail Polish.
Plastering
Removing the existing plaster up to Brick/Block/RCC, carting away the debris, re-plastering it with two coats with cement mortar with a ratio of 1:4.Applying one coat of Acrylic Primer & two coats of Emulsion Plastic paint.
Oil Paint:
Applying two coats of Oil Paint after treating the surface with Red Oxide Primer, Putty, etc and scraping the loose old paint and scales of metal.
White Wash Paint :
Applying two coat of white wash over thoroughly cleaned and flake free surface.
Synthetic Texture :
Applying one coat of External Primer and 1 coat of Texture over cleaned surface up to 2mm thick.
Crack filling :
Opening the cracks and filling it with crack filler.
Hand Rail Polish :
Hand Rail Polish.
Plastering
Cement: Sand mixed with W/P compound by weight of cement. Curing is done for 7 days.
Plastering (Internal) POP finish
Removing the existing plaster up to Brick/Block/RCC, carting away the debris, re-plastering it in one coat cement mortar 1:4
Cement:Cured for 3 days.
Dash Coat
Applying 1 coat of dash coat on an uneven area of wall after removing the plaster.
Plumbing
We remove the existing drain pipes and provide and fix new 1st quality (ISI) Supreme / Prince pipes and fittings for drainage lines on GI brackets 50mm away from ext. plaster, which include Tees, Bends, Y connectors, Shoe etc., along with filling gaps completely.Galvanized Iron G. I. Water Line
Removing the existing damage G. I. Line providing and fixing C Class Tata / Zenith (ISI) pipes for terrace and external wall with ISI fittings on GI clamps away 50mm form wall.
Structural Repairs
RCC Polymer RepairsRemoving the existing loose parts of concrete. Cleaning the reinforcement with wire brush, applying rust remover with brush. After 24 hrs rust inhibitor and cement slurry in 1:1.5 is applied, polymer with cement is applied by brush and steel is covered with Polymer Modified Mortar in 1:5:15 Polymer: cement: quartz sand up to 10-12mm thick in one coat. Curing is done for 5 days.
Joint Stitching
We open the separation gaps between RCC & Brick junction, and fill the same with mortar mixed with polymer. & metal to be embedded.
Grouting
Providing and grouting honeycomb area of bricks, RCC etc.
Tor Steel
Providing & fixing in position TOR steel bar reinforcements of various dia for coping chajjas etc.
Coping
Providing & Laying RCC coping on terrace parapet in M150 (1:2:4) Note: cost of steel will be separate.
Jacketing
Removing the existing damaged concrete, treating the steel and surface providing and laying Concrete M-20 1:1½: 3 including shuttering, proper finishing, curing etc. but (excluding reinforcement.)
Waterproofing
Chajja W/P / Lift Machine Top / O.H. Tank TopRemoving the existing waterproofing up to slab, providing and applying w/p coat followed by brickbat coba and IPS, curing for 7 days.
Terrace Waterproofing
Removing the entire existing Waterproofing up to slab level. Filling the cracks with polymer Modified Mortar. Providing & applying two coats of waterproof coating on the entire surface. Ponding with 100mm deep water for 12 hours to identify defects in the slab providing and laying Brick Bat Coba with cement mortar mixed with 1: 4. Curing for 7 days & laying IPS over BBC in 1:4 mortars mixed with waterproofing compound by weight of cement. Ponding with water for further testing the Waterproofing work. Providing & laying broken glazed tiles for finishing in multi-color (I.e. China Mosaic Chips). VATA will be charged in Rft. Final testing with water for 12-14 days.
Tank Waterproofing
Removing the existing tank waterproofing up to RCC, providing and applying w/p coat followed by brickbat coba / IPS / plaster, curing for 5 days. (Plumbing diversion will be charged extra.)
Texture Coating
Texture Coating hides hairline cracks, filled cracks and undulations It has strong adhesion, and resists fungus and algae growth.